Dry Lengths and Discharge

This table links streamflow data to recorded dry lengths

A "P" under the Data Qualifer column indicates provisional data, while "A" indicates approved data. An 'e' indicates that data has been edited. See more details from the USGS here

> Click on column headers once to sort ascending, and a second time to sort descending

Clear Filters
Date Upstream Dry River Mile Dry Length (RMs) USGS Full Name Discharge, Cubic Feet per Second Data Qualifier
04/10/2018 88.00 14.00 FLOODWAY AT SAN MARCIAL 22.2 A
04/30/2018 92.90 18.90 Rio Grande at Alameda Bridge at Alameda 578.0 A
04/21/2018 89.30 15.30 FLOODWAY AT SAN MARCIAL 19.2 A
04/20/2018 89.60 15.60 FLOODWAY AT SAN MARCIAL 21.9 A
04/19/2018 89.00 15.00 FLOODWAY AT SAN MARCIAL 22.1 A
04/18/2018 89.10 15.10 FLOODWAY AT SAN MARCIAL 24.9 A
04/17/2018 88.80 14.80 FLOODWAY AT SAN MARCIAL 24.4 A
04/16/2018 88.80 14.80 FLOODWAY AT SAN MARCIAL 20.9 A
04/15/2018 88.50 14.50 FLOODWAY AT SAN MARCIAL 20.5 A
04/14/2018 89.10 15.10 FLOODWAY AT SAN MARCIAL 19.5 A
04/13/2018 89.10 15.10 FLOODWAY AT SAN MARCIAL 19.1 A
04/12/2018 88.80 14.80 FLOODWAY AT SAN MARCIAL 19.2 A
04/11/2018 88.20 14.20 FLOODWAY AT SAN MARCIAL 22.5 A
04/22/2011 81.50 7.50 FLOODWAY AT SAN MARCIAL 51.2 A
04/09/2018 86.90 12.90 FLOODWAY AT SAN MARCIAL 15.9 A
04/08/2018 85.80 11.80 FLOODWAY AT SAN MARCIAL 17.6 A
04/07/2018 83.90 9.90 FLOODWAY AT SAN MARCIAL 19.7 A
04/06/2018 83.10 9.10 FLOODWAY AT SAN MARCIAL 24.2 A
04/05/2018 83.10 9.10 FLOODWAY AT SAN MARCIAL 22.6 A
04/04/2018 81.80 7.80 FLOODWAY AT SAN MARCIAL 21.1 A
04/03/2018 77.40 3.40 FLOODWAY AT SAN MARCIAL 23.9 A
04/02/2018 76.30 2.30 FLOODWAY AT SAN MARCIAL 24.1 A
04/01/2018 74.50 0.50 FLOODWAY AT SAN MARCIAL 23.9 A
04/25/2011 74.00 0.00 FLOODWAY AT SAN MARCIAL 50.1 A
04/24/2011 75.00 1.00 FLOODWAY AT SAN MARCIAL 50.5 A